CORBA Mountain Biking Photos. Click on an image to see it full size.
 |
The end of the work area, where it joins an Edison road
|
|
 |
The old trail is now covered with brush to discourage people from using it
|
|
 |
These two built a pretty rock pathway to their resting area
|
|
 |
Liz chops out a stump
|
|
 |
It really is a lot of fun!
|
|
 |
At the end of the work session, everyone was in the orange section. It was a very difficult area
|
|
 |
Workers from many crews on the orange section
|
|
|
 |
Some of the orange section workers, with a new trail in the foreground
|
|
 |
Working on a turn
|
|
 |
Hans tamps the dirt down
|
|
|
 |
That rock is seriously resisting attempts to remove it!
|
|
 |
Finished for the day!
|
|
 |
Trail workers wind their way back to the trailhead to board the busses back to lunch
|
|
 |
Richard and Lisa return on a section that didn't exist a few hours earlier
|
|
 |
On the bus, headed for lunch
|
|
 |
Lining up for the BBQ lunch - hot dogs and tri-tip sandwiches
|
|
 |
Giving away the prizes to trail workers, the best of which was the bike shown here
|
|
 |
Eating lunch and listening for your ticket number to win a bike!
|
|
|