The Conejo Spring Trailwork Day: Restoring Trails in the Western Plateau area after severe erosion from winter rains; on March 18, 2017

CORBA Mountain Biking Photos. Click on an image to see it full size.

Photos Home   | Next Page

IMG_6065.jpg
Crew 1 work area
IMG_6066.jpg
Crew 2 work area, to build a new trail segment that bypasses the mud pit.
IMG_6068.jpg
Crew 3 work area, to widen the trail by digging out the 'slough' that's fallen onto the inside edge of the trail.
IMG_6069.jpg
Crew 4 work area, to fill the large rut with gravel from the stream.
IMG_6070.jpg
Crew 4 work area, to fill the huge rut with gravel from the stream. Unfortunately we didn't have enough people to form a Crew 4, so these huge ruts are still there.
IMG_6071.jpg
The rest of the photos are of Crew 5 at work. Here they're widening the trail.
IMG_6072.jpg

IMG_6073.jpg
This rut need to be filled and a drain built to keep the water from flowing down the trail and regenerating the rut.
IMG_6074.jpg
Filling in a rut and leveling the trail We did a lot of this!
IMG_6076.jpg

IMG_6077.jpg
Building a new drain to divert water off the trail. We did a lot of this, too.
IMG_6078.jpg

IMG_6079.jpg

IMG_6080.jpg

IMG_6081.jpg
The trail widening is coming along very well!
IMG_6082.jpg

IMG_6083.jpg

IMG_6084.jpg

IMG_6085.jpg

IMG_6086.jpg

IMG_6087.jpg

IMG_6088.jpg
The trail looks almost new after filling the center rut and levelling it out!
IMG_6089.jpg
We had a big rut to fill, so we took gravel from the streambed and dumped it in the rut.
IMG_6090.jpg
Chopping out a yucca plant that's in the way of a new drain.
IMG_6091.jpg

IMG_6094.jpg
This new drain is almost finished. The final step(s) is to pack it down by stamping it with your feet.
IMG_6096.jpg

IMG_6097.jpg
This trail 'cut' (shortcut) is being covered with rocks to disuade people from using it.
IMG_6099.jpg
Filling in the rut with gravel taken from the steambed.
IMG_6101.jpg